[Scope of application]
adviceXross, adviceLUNA II, adviceLUNA
[Question]
Is there any rule for turning on the power?
[Answer]
Please follow the following order when turning on ICE and user system power.
Power on procedure
- Connect ICE and the user system before turning on the power of both ICE and user system.
- Turning on the power of ICE
- Make sure that the ICE POWER LED lights up in green.
- Turning on the power of user system.
- Start up microVIEW-PLUS (or reopen the project).
Power off procedure
- Exit microVIEW-PLUS (or save the project).
- Turning off the power of user system.
- Turning off the power of ICE.
- Remove the ICE from user system.
Procedure for when connecting ICE while the power of user system is turned on (Hot plug connection)
- Turning on the power of ICE
- Make sure that the ICE POWER LED lights up in green.
- Make sure that the TPOWER LED is turned off.
- Connect ICE to the working user system.
- Start up microVIEW-PLUS (or reopen the project).
- Select the Connect button, or enable the JTAG connection by executing [attach exec break] command.
Procedure for when removing ICE while the power of user system is turned on (Hot plug removal)
- Execute [detach exec] command or [detach exec go] command from microVIEW-PLUS to disable the JTAG connection.
- Make sure that the TPOWER LED is turned off.
- Remove the ICE from user system.